Metal Parts High Precision Aluminium Die Casting with Powder Coating Anodizing
Overview Product Description Detailed Photos Certifications Company Profile NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY
Basic Info
Model NO. | 381 |
Trademark | Customized |
Origin | Ningbo |
HS Code | 8708999990 |
Production Capacity | 100000PCS/Year |
Product Description
Material: | ADC-12 |
Cavity Number: | 1 |
Process Technology: | High Pressure Die Casting |
Product Dimensions: | Customized |
Casting General Tolerance: | Grade GB-CT4 |
Surface Finish: | Polishing, Vibratory Deburring, Powder Coating, Painting,etc. |
Flow Processes: | Die Casting, Trimming, Polishing, Vibratory Deburring, Machining, Cleaning,Spray Coating,Packing, Shipping |
Control Measure: | Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control |
Inspection Equipment: | CMM, Caliper, Plug Gage,Thread Gage,Tensile Tester,Roughness Meter,Spectrograph,Air Gage,Air Leak Test,Projector,Pneumatic Measuring Tool,etc. |
Application: | Auto Parts |
Certificate: | IATF16949:2016 |
Lead Time | 30-35 days |
Trade Term: | FOB Ningbo |
Certifications
Company Profile
NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY was established in 2001. BOLANG centres high precision CNC machining as our core competence, the company specializes in producing auto parts, agriculture parts, machinery parts, lighting parts, hardware fittings etc. We can provide pressure casting, sand casting, investment casting, gravity casting, the material covers aluminum alloy such as A380, A390, ADC12,YL102, A356, aluminum extrusion of 6000 series, zinc alloy, iron, copper etc.The products are mainly exported to countries such as USA, Europe (England, Germany, Italy, Belgium etc), Asia (Japan,Korea etc). And the company has successfully passed IATF16949:2016 quality management certificate,ISO45001,ISO14001 certificate.FAQ
FAQ |
Q1. When can I get the price? |
A: We usually quote within 2-3 days after we receive the RFQ or feedback within 2 days if any questions on prints need to be confirmed. |
Q2. How long is the lead-time for mold? |
A: Usually it depends on the size and complexity of the mold. But normally, the lead time is 35-45days. |
Q3. I have no 3D drawing, how should I start the new project? |
A: You can supply us a sample, we will help work on establishing 3D model accordingly. |
Q4. Before shipment, how to ensure the products quality? |
A: We have strict development procedure, during samples development, we have capacity to produce according to PPA, after PSW approved, |
Send to us